Project area: the total area of the original classroom is about 125 square meters;
It is divided into grooming teaching area of 96 square meters and bathing teaching area of 29 square meters;
Equipment budget: USD 40,000 (excluding the construction costs of water and electricity transformation, classroom partition, etc.);
Working station:
Grooming teaching area: 1 teacher station + 1 assistant teacher station + 35 student working stations;
Bath teaching area: 2 Spa teaching stations + 7 Bath teaching stations + 1 foster cage bank;
Estimated power consumption: the power consumption of teaching equipments is about 62kW, and that of air conditioners, lighting, and water heaters is about 35kW.
Figure 1 (original drawing)
Figure 2 (front view)
Figure 3 (front view)
Figure 4 (overall perspective)
Figure 5 (perspective view of grooming teaching area)
Figure 6 (perspective view of wet area)
Figure 7 (3D rendering of grooming teaching area)
Figure 8 (3D rendering of grooming teaching area)
Figure 9 (3D rendering of bathing teaching area)
Figure 10 (3D rendering of bathing teaching area)