Project area: the total area of the original classroom is about 77 square meters;
It is divided into Grooming teaching area of 49 square meters and bathing teaching area of 28 square meters;
Equipment budget: USD 16,000 (excluding construction costs of water and electricity transformation, classroom partition, etc.);
Working station:
Grooming teaching area: 1 teacher station + 1 assistant teacher station + 28 student working stations;
Bathing teaching area: 8 bathing teaching stations + 2 foster cages;
Estimated power consumption: the power consumption of teaching equipments is about 40kW, and that of air conditioning, lighting and water heaters is about 30kW.
Note: no original drawings.
Figure 1 (front view)
Figure 2 (overall perspective)
Figure 3 (3D rendering of Grooming teaching area)
Figure 4 (3D rendering of Grooming teaching area)
Figure 5 (3D rendering of Grooming teaching area)
Figure 6 (3D rendering of bathing teaching area)
Figure 7 (3D rendering of bathing teaching area)
Figure 8 (3D rendering of bathing teaching area)