Project area: the total area of the original classroom is about 140 square meters;
Grooming teaching area is about 73 square meters, bathing teaching area is about 29 square meters (including a small foster area)
The teaching area of cat Grooming is about 38 square meters;
Equipment budget: USD 36,000 (excluding the construction costs of water and electricity transformation, classroom partition, etc.);
Grooming teaching area: 1 teacher station + 1 assistant teacher station + 36 student working stations;
Bath teaching area: 2 spa teaching station + 8 bathing teaching stations + 1 set of large drying equipment;
Cat Grooming teaching area: 2 teacher station + 4 student working stations + 4 sets of cat drying equipment;
Estimated power consumption: the power consumption of teaching equipments is about 98kW, and that of air conditioning, lighting, water heater is about 45kW.
Figure 1 (front view)
Figure 2 (front view)
Figure 3 (overall perspective)
Figure 4 (overall perspective)
Figure 5 (perspective view of wet area)
Figure 6 (3D rendering of beauty teaching area)
Figure 7 (3D rendering of beauty teaching area)
Figure 8 (3D rendering of bathing teaching area)
Figure 9 (3D rendering of Cat grooming teaching area)